狠痕鲁狠狠爱2021在-激情影院内射美女-久久97久久97精品免视看秋霞-亚洲人成日韩中文字幕不卡-国语自产视频在线

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 四虎影视精品永久在线观看| 十八禁视频网站| 深夜大尺度一区二区| 午夜亚洲第一区| 国产97在线 | 免费| 国产一卡2卡3卡四卡精品网站| 蜜臀av夜夜澡人人爽人人| 日韩好片一区二区在线看| 在线看片无码永久av| 精品国产一区二区av麻豆| 国产精品久久久久久亚洲影视内衣| 国产亚洲精品麻豆一区二区| 亚洲日本在线在线看片| 日韩在线 一区二区三区| 日韩在线一区视频在线观看| 日韩欧美一区二区激情| 色情一区二区三区免费看| 亚洲欧洲av无码电影在线观看| 日韩精品一区二区三区影院| 男人的天堂中文字幕熟女人妻| 亚洲日韩久热中文字幕| 中文字幕中文乱码www| 国产性夜夜春夜夜爽免费下载 | 人人妻人人澡人人爽人人精品浪潮| 精品国产午夜理论片不卡| 国产在线精品无码av不卡顿| 久久频这里精品99香蕉| 亚洲一区欧美一区| 国产呦福利呦交欧美一区| 国产一区二区三区美女| 国产精品免费久久久久影院仙踪林| 黄色视频免费观看| 强开小婷嫩苞又嫩又紧视频| 不卡一区二区视频日本| 自拍高清在线一区亚洲| 亚洲成a人无码| 无码区日韩特区永久免费系列| 国产成人一卡2卡3卡4卡| 中文字幕+乱码+中文字幕无忧| 国产精品丝袜肉丝出水| 日本亚洲欧美日韩一区|